Time, Speed and Distance MCQs MCQs - Maths Practice | PakExamPoint

Practise Time, Speed and Distance MCQs MCQs in Maths. Attempt multiple-choice questions, check answers and revise related subtopics.

Time, Speed and Distance MCQs MCQs and revision practice

Study Time, Speed and Distance MCQs through multiple-choice questions in Maths. This subtopic contains 295 practice questions. Read the wording carefully, compare the options and attempt an answer before checking the solution in learning mode.

Use these Time, Speed and Distance MCQs MCQs to identify the facts, rules or methods you need to revise. Where an explanation is available, work through it and write down why your chosen option was correct or incorrect. Revisit difficult questions after reviewing your notes, then use exam mode for timed practice.

Continue your revision with related topics: 100 Most Repeated MCQs of Math MCQs, Algebra MCQs MCQs, Analogy MCQs MCQs, Average MCQs Math MCQs, Basic Math MCQs, Direction Sense MCQs MCQs, Geometry MCQs MCQs, IQ Past Papers MCQs MCQs.

Return to all Maths topics to choose your next area of study. Read the MCQ study guide to plan your revision, or try a Maths practice quiz.

Time, Speed and Distance MCQs: questions and answer review

Try each question before opening its answer. Record the concept behind each mistake and revisit it during your next practice session.

101. A train runs at 90 km/h. It crosses a pole in 20 seconds. What is the length of the train?

Check answer and explanation

Answer: 500 m

Explanation Given: Speed = 90 km/h Time = 20 seconds First, convert speed to m/s: Speed = 90 km/h × (1000 m/km) / (3600 s/h) Speed = 25 m/s Length of the train = Speed × Time Length = 25 m/s × 20 s Length = 500 m

102. 30 labourer's working 7 hours a day can finish a piece of work in 18 days, if the Labourer's work 6 hours a day, the number of Labourers required to finish the same piece of work in 30 days will be _________.

Check answer and explanation

Answer: 21

Explanation Let the required number of labourers be x Less working hour/day, More labours (Indirect proportion) More days, fewer labourers (Indirect proportion)

103. A is thrice as good as B in work. A is able to finish a job in 60 days less than B. They can finish the work in ______ days if they work together.

Check answer and explanation

Answer: 22 ½ days

Explanation If A completes a work in 1 day, B completes the same work in 3 days Hence, if the difference is 2 days, B can complete the work in 3 days => if the difference is 60 days, B can complete the work in 90 days => Amount of work B can do in 1 day= 1/90 Amount of work A can do in 1 day = 3 × (1/90) = 1/30 Amount of work A and B can together do in 1 day = 1/90 + 1/30 = 4/90 = 2/45 => A and B together can do the work in 45/2 days = 22 ½ days

104. A square shaped ground is 20 meter long. If a person takes 5 rounds of the ground, how much total distance does he cover?

Check answer and explanation

Answer: 400 m

Explanation Step 1: Calculate the perimeter of the square ground. The perimeter of a square is given by P = 4 × side length. Here, the side length is 20 meters. P = 4 × 20 = 80 meters Step 2: Calculate the total distance covered in 5 rounds. Total distance = Number of rounds × Perimeter Total distance = 5 × 80 = 400 meters

105. A train is 130 m long it travels at a speed of 45 km/hr. It crosses a bridge in 30 seconds. The length of the Bridge is?

Check answer and explanation

Answer: 245 m

Explanation Convert the speed of the train from km/hr to m/s: 45 km/hr = 45 × 1000 m / 3600 s = 12.5 m/s The train crosses the bridge in 30 seconds, so the total distance covered is the length of the train plus the length of the bridge. Let's call the length of the bridge "x". Then, the total distance = 130 m (train length) + x. Since the train crosses the bridge in 30 seconds, we can use the formula: Distance = Speed × Time Substitute the values: 130 m + x = 12.5 m/s × 30 s Simplify the equation: 130 m + x = 375 m Subtract 130 m from both sides: x = 245 m So, the length of the bridge is 245 m .

106. Six men working 8 hours a day earn Rs 720 per week. 8 men working 6 hours a day will earn per week?

Check answer and explanation

Answer: 720

Explanation Given: 6 men × 8 hours/day = total man-hours per day = 48 man-hours They earn Rs. 720 per week Now: 8 men × 6 hours/day = 48 man-hours per day — same total man-hours as before So, since the total man-hours per day (and thus per week) are the same, the weekly earnings will also be the same. Last verified on 02-04-2026

107. If the bus leaves at 6:35 and arrives at 6:45, how many minutes will it take?

Check answer and explanation

Answer: 10 minutes

Explanation The time taken is the difference between the arrival time and the departure time. arrival time: 6:45 departure time: 6:35 6:45 - 6:35 = 10 minutes.

108. A square floor has a diagonal of 30 feet. What is the closest estimate of the perimeter, in feet, of the floor?

Check answer and explanation

Answer: 85

Explanation Step 1: Use the Diagonal Formula for a Square For a square with side length s s s , the diagonal d d d is given by: d = s 2 d = ssqrt{2} ​ Substituting d = 30 d = 30 30 = s 2 30 = ssqrt{2} Step 2: Solve for s s = 30 2 s = frac{30}{sqrt{2}} ​ Multiply numerator and denominator by 2 sqrt{2} ​ to rationalize: s = 30 2 2 = 15 2 s = frac{30sqrt{2}}{2} = 15sqrt{2} ​ Approximating 2 ≈ 1.414 sqrt{2} approx 1.414 2 s ≈ 15 × 1.414 = 21.21 Step 3: Calculate the Perimeter The perimeter P P of a square is: P approx 4 times 21.21 = 84.84 P=4s P≈4×21.21=84.84 The closest estimate is 85.

109. A water tank in the shape of a cuboid has a length of 1.5 meters and a width of 1.0 meters. How many liters of water are in the tank if the water is 60 centimeters deep?

Check answer and explanation

Answer: 900 litres

Explanation Volume of the tank = Length * Width * Height First, we need to convert the depth from centimeters to meters: 60 cm = 0.6 m Now, we can calculate the volume: Volume = 1.5 m * 1.0 m * 0.6 m = 0.9 cubic meters 1 cubic meter is equal to 1000 liters. So, 0.9 cubic meters = 0.9 * 1000 = 900 liters. Therefore, there are 900 liters of water in the tank.

110. 10 women can complete a work in 7 days, and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?

Check answer and explanation

Answer: 7 days

Explanation Work done by 10 women in 7 days = 1 Work done by 1 woman in 7 days = 1/10 Work done by 1 woman in 1 day = 1/(10 × 7) = 1/70 Work done by 10 children in 14 days = 1 Work done by 1 child in 14 days = 1/10 Work done by 1 child in 1 day = 1/(10 × 14) = 1/140 Work done by 5 women in 1 day = 5 × 1/70 = 5/70 = 1/14 Work done by 10 children in 1 day = 10 × 1/140 = 10/140 = 1/14 Total work done per day = 1/14 + 1/14 = 2/14 = 1/7 Total days required = 7 days

Found a mistake? Use “Report correction” in the practice tool or contact us with the question and a supporting source.