100 Most Repeated MCQs of Math MCQs - Maths Practice | PakExamPoint

Practise 100 Most Repeated MCQs of Math MCQs in Maths. Attempt multiple-choice questions, check answers and revise related subtopics.

100 Most Repeated MCQs of Math MCQs and revision practice

Study 100 Most Repeated MCQs of Math through multiple-choice questions in Maths. This subtopic contains 1095 practice questions. Read the wording carefully, compare the options and attempt an answer before checking the solution in learning mode.

Use these 100 Most Repeated MCQs of Math MCQs to identify the facts, rules or methods you need to revise. Where an explanation is available, work through it and write down why your chosen option was correct or incorrect. Revisit difficult questions after reviewing your notes, then use exam mode for timed practice.

Continue your revision with related topics: Algebra MCQs MCQs, Analogy MCQs MCQs, Average MCQs Math MCQs, Basic Math MCQs, Direction Sense MCQs MCQs, Geometry MCQs MCQs, IQ Past Papers MCQs MCQs, Math Short Questions MCQs.

Return to all Maths topics to choose your next area of study. Read the MCQ study guide to plan your revision, or try a Maths practice quiz.

100 Most Repeated MCQs of Math: questions and answer review

Try each question before opening its answer. Record the concept behind each mistake and revisit it during your next practice session.

441. The day after the day after tomorrow is four days before Monday. What day is it today?

Check answer and explanation

Answer: Monday

Explanation Let's break it down: "Four days before Monday" would be Thursday (Monday -> Sunday -> Saturday -> Friday -> Thursday). "The day after the day after tomorrow is Thursday": Tomorrow is one day ahead. The day after tomorrow is two days ahead. The day after the day after tomorrow is three days ahead. If three days ahead is Thursday, let's determine what day today is: Thursday (3 days ahead) -> Wednesday (2 days ahead) -> Tuesday (1 day ahead) -> Monday (today).

442. A man is leading 60,000 at simple interest at the rate of 9% per year. What is the principle mount and interest he repaid after 3 years?

Check answer and explanation

Answer: 76200

Explanation I=P×R×T Principal amount (P) = 60,000 Rate of interest (R) = 9% per year Time (T) = 3 years Simple interest (SI) = (P x R x T) / 100 = (60,000 x 9 x 3) / 100 = 16,200 The total amount he repaid after 3 years is: Principal + Interest = 60,000 + 16,200 = 76,200

443. The ratio of 5 minutes to 180 seconds is _____?

Check answer and explanation

Answer: 5:3

Explanation Convert minutes to seconds: 5 minutes = 5 × 60 = 300 seconds Ratio = 300 seconds : 180 seconds = 5:3

444. The average of two numbers is XY. If one number is equal to x. the other number is equal to _________ ?

Check answer and explanation

Answer: 2XY - X

Explanation Sum of both numbers = 2XY Number is = 2XY - X

445. Find the 4th proportional to 4, 16 and 7?

Check answer and explanation

Answer: 28

Explanation

446. If a train runs 180 km per hour, how much distance will it travel in 8 hours?

اگر ایک ٹرین 180 کلومیٹر فی گھنٹہ چلتی ہے تو وہ 8 گھنٹے میں کتنا فاصلہ طے کرے گی؟

Check answer and explanation

Answer: 1440

Explanation If a train runs 180 km per hour, how much distance will it travel in 8 hours = 1440 Speed of train v=180 km/h Time taken t = 8 h So, distance covered by train D = v t D=180 × 8 = 1440 km

447. The total sum of all sides of a closed surface is called?

Check answer and explanation

Answer: Perimeter

Explanation The perimeter is the total sum of all sides of a closed figure or surface. It typically used for shapes like polygons (e.g., squares, triangles).

448. The Square root of 729 is?

Check answer and explanation

Answer: 27

Explanation 729 = 27 × 27 √729 = √(27 × 27) √729 = 27

449. 250 men can finish a work in 20 days working 5 hours a day. To finish the work within 10 days working 8 hours a day, the minimum number of men required is ______?

Check answer and explanation

Answer: 313

Explanation Let's calculate the total work hours: 250 men * 20 days * 5 hours/day = 25,000 man-hours To finish the work in 10 days working 8 hours a day: Let x be the number of men required: x men * 10 days * 8 hours/day = 25,000 man-hours (to complete the same amount of work) x * 80 = 25,000 x = 25,000 / 80 x = 312.5 (313)

450. The decimal representation of 1/4 is?

Check answer and explanation

Answer: 0.25

Explanation 1/4 is equal to 0.25 , which represents one part of four equal parts of a whole. Last verified on 10-02-2026

Found a mistake? Use “Report correction” in the practice tool or contact us with the question and a supporting source.